| log in |
Message boards : News : Test problem (#3) solved!
| Author | Message |
|---|---|
|
The key has been found by our current top user – laurenu2 from Free-DC team. Congratulations! Our thanks to all participants! | |
| ID: 88 · Rating: 0 · rate:
| |
|
LT | |
| ID: 89 · Rating: 0 · rate:
| |
|
Afaik. sending it to the same host is not an option, BOINC should not do that at all because it violated the validation concept. | |
| ID: 90 · Rating: 0 · rate:
| |
|
We do not use replication for validation. However, I missed this possibility with the canceled tasks returning to the same host. I have included the according option into project configuration to avoid this happening in the future. | |
| ID: 91 · Rating: 0 · rate:
| |
|
To avoid possible wrong interpretations... | |
| ID: 92 · Rating: 0 · rate:
| |
Message boards :
News :
Test problem (#3) solved!